We have developed equipment that determines burnup by measuring gamma radiation emitted from spent nuclear fuel, and we provide spent nuclear fuel burnup measurement services using overseas burnup measurement systems. We are also carrying out a government-funded project to develop and establish a spent nuclear fuel safety information database system.
During scheduled outages at light-water reactors, we provide technical support for the operation and testing of reactivity computers used in zero-power reactor physics testing to evaluate core characteristics.
During scheduled outages at light-water reactors, we provide operational support for subcriticality monitoring equipment used during fuel loading, as well as technical support for monitoring core conditions.
During initial core fuel loading, neutron leakage is extremely low, making it difficult to accurately monitor core conditions using only the ex-core instrumentation used during refueling. Temporary in-core detectors must therefore be installed during fuel loading. We provide technical support for the installation and operation of this temporary in-core instrumentation.
Following major plant modifications, we measure the reactivity worth of the liquid zone control system used to control core power. We have completed the development of a reactivity computer for measuring the reactivity worth of the liquid zone control system at Wolsong Unit 1.
We provide technical support for the operation and testing of the movable in-core detector system used to measure the core neutron flux distribution.
We provide technical support for subcriticality monitoring equipment used to monitor subcritical multiplication during the initial approach to criticality in heavy-water reactors.
We provide technical support for auxiliary ex-core neutron flux monitoring systems used for initial cores in light-water reactors.
During scheduled maintenance of PWR plants, we provide technical support for the operation and testing of the Digital Reactivity Computer System (DRCS) used in LPPT testing.
During scheduled maintenance of PWR plants, we support the operating technology of the subcritical monitoring system (ONICE) used for nuclear fuel loading.
We support the installation and operation of the Temporary Neutron Monitoring System (TNMS) for initial core fuel loading.
We develop reactivity computers for PHWR and provide on-site technical support.
We provide technical support for the operation and testing of the mobile in-core detector system used to measure neutron flux distribution.
We provide technical support for the PHWR subcritical monitoring system during the initial approach to criticality.
| No. | Project Title | Period | Client |
|---|---|---|---|
| 63 | U2RFO3 Reactivity Computer Technical Support | 2026.05.19 ~ 2026.06.09 | Nawah Energy |
| 62 | U3RFO2 Reactivity Computer Technical Support | 2025.11.12 ~ 2025.11.27 | Nawah Energy |
| 61 | U4RFO1 Reactivity Computer Technical Support | 2025.08.13 ~ 2025.08.30 | Nawah Energy |
| 60 | U1RFO3 Reactivity Computer Technical Support | 2025.03.24 ~ 2025.04.23 | Nawah Energy |
| 59 | Advancement of Web-Based Core Operation Support Technology and Development of an In-House Code Design Verification System | 2026.01.20 ~ 2029.01.19 | Korea Hydro & Nuclear Power Co., Ltd. |
| 58 | Preliminary Review Service for the Development of In-Core Neutron Flux Monitoring Equipment for Fuel Loading | 2025.12.24 ~ 2027.12.13 | Korea Atomic Energy Research Institute |
| 57 | Development of In-Core Instrumentation System Diagnostic Equipment for Nuclear Power Plant Field Use | 2024.08.01 ~ 2026.07.31 | Ministry of SMEs and Startups |
| 56 | Development of a Multi-Purpose High-Precision Measurement System for Improved Autonomous Operation Performance and Safety | 2023.04.01 ~ 2027.12.31 | Ministry of Science and ICT |
| 55 | U2RFO2 Reactivity Computer Technical Support | 2024.09.27 ~ 2024.10.27 | Nawah Energy |
| 54 | Supply of Reactivity Computer and Subcritical Monitoring Equipment for Hanul Units 3 and 4 | 2024.05.23 ~ 2024.09.30 | Korea Hydro & Nuclear Power Co., Ltd. |
| 53 | U3RFO1 Reactivity Computer Technical Support | 2024.04.13 ~ 2024.05.11 | Nawah Energy |
| 52 | BNPP Unit 4 TFLC Installation and Maintenance Services | 2023.10.25 ~ 2023.12.31 | KEPCO KPS Co., Ltd. |
| 51 | Supply of APR1400 Core Simulator | 2023.09.01 ~ 2023.10.31 | Korea Hydro & Nuclear Power Co., Ltd. |
| 50 | Services of Calibration and Testing of ADRCS for BNPP Unit 2 Cycle 2 | 2023.03.15 ~ 2023.04.14 | Nawah Energy |
| 49 | Development of an Integrated Core Database for APR1400 Nuclear Power Plants and Technical Support for Reactor Characteristic Tests | 2022.08.10 ~ 2025.02.16 | Korea Hydro & Nuclear Power Co., Ltd. |
| 48 | Services of Calibration and Testing of ADRCS for BNPP Unit 1 Cycle 2 | 2022.05.26 ~ 2022.07.26 | Nawah Energy |
| 47 | BNPP Unit 3 TFLC Installation and Maintenance Services | 2022.04.22 ~ 2022.07.05 | KEPCO KPS Co., Ltd. |
| 46 | Spent Nuclear Fuel Burnup Measurement and Result Analysis | 2022.03.03 ~ 2022.11.30 | KEPCO Nuclear Fuel Co., Ltd. |
| 45 | Development of a Monitoring System for Fuel Transfer Status in Light Water Reactor Nuclear Power Plants | 2021.11.01 ~ 2022.10.31 | Ministry of SMEs and Startups |
| 44 | Development of a Visualization Tool for the Molten Material Pool in a Calandria Tank | 2021.08.10 ~ 2021.10.08 | Korea Atomic Energy Research Institute |
| 43 | Standardization of Safety Information Lists and Development of an Information System for the Entire Spent Nuclear Fuel Cycle | 2021.08.02 ~ 2026.12.31 | Ministry of Trade, Industry and Energy |
| 42 | BNPP Unit 2 TFLC Installation and Maintenance Services | 2021.01.25 ~ 2022.03.25 | KEPCO KPS Co., Ltd. |
| 41 | Improvement of Reactivity Computer for Reactor Characteristic Tests and Development of Training Tools | 2020.08.13 ~ 2022.01.31 | Korea Hydro & Nuclear Power Co., Ltd. |
| 40 | Localization of High-Performance In-Core Detector Signal Measurement System and Development of Fundamental Technology Based on Prompt Response Measurement | 2020.05.01 ~ 2023.04.30 | Ministry of Trade, Industry and Energy |
| 39 | BNPP Unit 1 TFLC Installation and Maintenance Services | 2020.01.02 ~ 2020.07.14 | KEPCO KPS Co., Ltd. |
| 38 | Maintenance and Operation Services for Shin Hanul Units 1 and 2 TNMS | 2019.12.18 ~ 2021.03.31 | Korea Hydro & Nuclear Power Co., Ltd. |
| 37 | Development of Multi-Cycle Optimal Core Design Technology Based on Simulated Annealing | 2019.03.20 ~ 2021.02.28 | Korea Hydro & Nuclear Power Co., Ltd. |
| 36 | Development of an Automated Analysis and History Management Database System for Core Fuel Operation Data | 2017.07.03 ~ 2018.08.31 | Korea Hydro & Nuclear Power Co., Ltd. |
| 35 | Development of Core Technology for a Sensor Transfer System for Dry Cask Storage System Inspection of Spent Nuclear Fuel | 2017.05.01 ~ 2020.04.30 | Ministry of Trade, Industry and Energy |
| 34 | Supply of TDAS for Shin Hanul | 2017.03.07 ~ 2017.06.30 | Korea Hydro & Nuclear Power Co., Ltd. |
| 33 | Technical Support for Initial ZPPT (Zero Power Physics Test) at UAE Barakah Nuclear Power Plant | 2016.12.16 ~ 2020.06.15 | Korea Hydro & Nuclear Power Co., Ltd. |
| 32 | Supply of Reactivity Computer and Subcritical Multiplication Monitoring Equipment for UAE Barakah Nuclear Power Plant | 2016.05.16 ~ 2017.02.28 | Korea Hydro & Nuclear Power Co., Ltd. |
| 31 | Provision of Educational Simulators and Training for Nuclear Workforce Development at Three Asian Universities | 2016.01.01 ~ 2017.08.31 | Hanyang University |
| 30 | Development of GUI for Educational Core Simulator | 2015.07.01 ~ 2016.04.30 | Korea Atomic Energy Research Institute |
| 29 | Development of Reactor Coolant Boron Concentration Monitoring Equipment | 2015.09.01 ~ 2018.08.31 | Ministry of Trade, Industry and Energy |
| 28 | Evaluation of Initial Characteristics of Low-Burnup Spent Nuclear Fuel | 2015.03.01 ~ 2019.09.30 | Ministry of Trade, Industry and Energy |
| 27 | Supply of TNMS Equipment for UAE Barakah Nuclear Power Plant | 2015.01.26 ~ 2018.01.01 | Korea Hydro & Nuclear Power Co., Ltd. |
| 26 | Development of an Operation Monitoring System for Overseas Power Plants | 2015.01.01 ~ 2015.09.30 | KEPCO Research Institute |
| 25 | Supply of Auxiliary Ex-Core Neutron Flux Monitoring Equipment for UAE Barakah Nuclear Power Plant | 2014.11.10 ~ 2017.03.31 | Doosan Heavy Industries & Construction |
| 24 | Development of Educational Neutron Flux Simulation Software | 2014.08.21 ~ 2014.10.20 | Korea Hydro & Nuclear Power Co., Ltd. |
| 23 | Localization Development of Ex-Core Neutron Flux Monitoring Equipment for Pressurized Water Reactors | 2013.12.01 ~ 2016.09.20 | Ministry of Trade, Industry and Energy |
| 22 | Development of Boron-Free Operation System Design Technology and Suitable Materials Technology | 2013.06.01 ~ 2018.05.30 | Ministry of Trade, Industry and Energy |
| 21 | Maintenance and Operation Services for Shin Kori Units 3 and 4 TNMS | 2012.12.08 ~ 2019.12.31 | Korea Hydro & Nuclear Power Co., Ltd. |
| 20 | Development of a Core Design Support and Verification System | 2012.10.16 ~ 2015.04.30 | Korea Hydro & Nuclear Power Co., Ltd. |
| 19 | Development of Reactor Characteristic Test System for APR1400 Nuclear Power Plants | 2012.09.15 ~ 2014.01.31 | Korea Hydro & Nuclear Power Co., Ltd. |
| 18 | Operation Services for Temporary Neutron Measurement Equipment at Shin Wolsong Unit 2 | 2012.06.28 ~ 2014.12.17 | Korea Hydro & Nuclear Power Co., Ltd. |
| 17 | Development of Suitability and Analysis Methodology for Reactivity Computer Algorithms for APR+ Core | 2012.06.15 ~ 2012.12.11 | KEPCO Nuclear Fuel Co., Ltd. |
| 16 | Operation of Temporary Neutron Measurement Equipment at Shin Wolsong Unit 1 | 2011.07.01 ~ 2011.09.30 | Korea Hydro & Nuclear Power Co., Ltd. |
| 15 | Development of Subcritical Neutron Multiplication Monitoring Software for CANDU Nuclear Power Plants | 2011.03.21 ~ 2011.06.30 | KEPCO E&C |
| 14 | Maintenance of Temporary Neutron Measurement Equipment at Shin Kori Unit 2 | 2011.03.17 ~ 2011.12.23 | Korea Hydro & Nuclear Power Co., Ltd. |
| 13 | Maintenance of Reactivity Computer and Subcritical Monitoring Equipment for Reactor Characteristic Tests | 2011.01.10 ~ 2018.12.31 | Korea Hydro & Nuclear Power Co., Ltd. |
| 12 | Development of a Three-Dimensional Core Analysis and Operation Support System | 2010.06.08 ~ 2011.10.31 | Korea Hydro & Nuclear Power Co., Ltd. |
| 11 | Development of Turbine Generator Weight Balancing Simulation Program | 2009.08.18 ~ 2009.11.17 | Korea Electric Power Corporation |
| 10 | Development of Reactivity Computer for CANDU Nuclear Power Plants | 2009.07.20 ~ 2011.01.19 | Korea Electric Power Corporation |
| 9 | Maintenance of Reactivity Computer for Reactor Characteristic Tests | 2009.01.01 ~ 2010.12.31 | Korea Hydro & Nuclear Power Co., Ltd. |
| 8 | Development of Reactivity Computer and Training System for OPR-1000 Nuclear Power Plants | 2008.07.02 ~ 2010.04.30 | Korea Electric Power Corporation |
| 7 | Development of Process Simulation System for Large-Capacity Coal-Fired Boilers | 2008.03.19 ~ 2008.06.13 | Korea Electric Power Corporation |
| 6 | Development of APR-1400 Core Model Production and Design Automation Program | 2008.01.02 ~ 2008.11.30 | Korea Electric Power Corporation |
| 5 | Development of Power Plant Dynamic Model and Performance Diagnosis System | 2007.10.15 ~ 2009.04.14 | Korea Electric Power Corporation |
| 4 | Development of CIM-Based AMR Model System and Information Service Portal | 2007.10.15 ~ 2008.02.13 | Korea Electric Power Corporation |
| 3 | Development of a Westinghouse Core Nuclear Design Code Integration Tool for SMART Core Calculation | 2007.04.10 ~ 2007.07.09 | Korea Electric Power Corporation |
| 2 | Development of Core Model Input Data Reflecting Power Uprate for Yeonggwang Units 1 and 2 Simulators | 2006.11.01 ~ 2007.11.30 | Korea Electric Power Corporation |
| 1 | Development of an Automatic Input Constants Generation Program for Core Models of Yeonggwang Units 1 and 2 Simulators | 2005.03.02 ~ 2005.07.31 | Korea Electric Power Corporation |